Ke Ke, Zhang Hui, Zhou Yuyang, Wang Lei, Feng Shilun. The Development of Testing Simulators for Conductor Jets Running in Deepwater Drilling[J]. Petroleum Drilling Techniques, 2015, 43(2): 33-37. DOI: 10.11911/syztjs.201502006
Citation: Ke Ke, Zhang Hui, Zhou Yuyang, Wang Lei, Feng Shilun. The Development of Testing Simulators for Conductor Jets Running in Deepwater Drilling[J]. Petroleum Drilling Techniques, 2015, 43(2): 33-37. DOI: 10.11911/syztjs.201502006

The Development of Testing Simulators for Conductor Jets Running in Deepwater Drilling

More Information
  • Received Date: August 24, 2014
  • Revised Date: March 01, 2015
  • Conductor jets running in deepwater drilling have different drilling parameters from that of land or shallow water drilling. In order to simulate the deepwater conductor jet running process, and provide experimental data for calculating operation parameter of conductor jetting running, a new simulating device for conductor jet running in deepwater drilling has been developed according to characteristics of deepwater conductor jet running, combined basic theory of soil mechanics with the form of running tool assembly. This device mainly consists of a soil box, pipe string, hoist, circulating loop, loading and measuring systems. It can simulate the whole process of conductor jet running. By changing the jet parameters and the geotechnical properties in the simulation test, the running speed of the conductor and bearing capacity, including the horizontal and vertical strain as well as the bearing capacity, can be measured, so as to study the relationship among jet parameters, the conductor running speed and bearing capacity during the course of conductor jet running for deepwater drilling under different geotechnical properties, develop a optimization design for conductor operation parameters, and provide a reference for the optimization design of conductor jets running in deepwater drilling of oil and gas well.
  • [1]
    路保平,李国华.西非深水钻井完井关键技术[J].石油钻探技术,2013,41(3):1-6. Lu Baoping,Li Guohua.Key technologies for deepwater drilling completion in West Africa[J].Petroleum Drilling Techniques,2013,41(3):1-6.
    [2]
    顾纯巍,张勇,郭永宾,等.接箍对海上隔水导管打桩的影响[J].断块油气田,2013,20(4):543-544. Gu Chunwei,Zhang Yong,Guo Yongbin,et al.Influence of coupling on conductor piling at sea[J].Fault-Block Oil and Gas Field,2013,20(4):543-544.
    [3]
    周俊昌,付英军,朱荣东.深水钻井送入管柱技术及其发展趋势[J].石油钻探技术,2014,42(6):1-7. Zhou Junchang,Fu Yingjun,Zhu Rongdong.Design method and development of landing strings in deepwater drilling[J].Petroleum Drilling Techniques,2014,42(6):1-7.
    [4]
    杨进,刘书杰,周建良,等.深水石油钻采工程模拟实验装置的研制[J].石油机械,2011,39(8):1-3. Yang Jin,Liu Shujie,Zhou Jianliang,et al.Deepwater petroleum drilling and production simulation system[J].China Petroleum Machinery,2011,39(8):1-3.
    [5]
    徐荣强,陈建兵,刘正礼,等.喷射导管技术在深水钻井作业中的应用[J].石油钻探技术,2007,35(3):19-22. Xu Rongqiang,Chen Jianbing,Liu Zhengli,et al.The application of jetting technology in deepwater drilling[J].Petroleum Drilling Techniques,2007,35(3):19-22.
    [6]
    Jeanjean P.Innovation design method for deepwater surface casings[R].SPE 77357,2002.
    [7]
    Gerwick B C Jr.Construction of marine and offshore structures[M].Boca Raton:CRC Press,2007:49-55.
    [8]
    张克恭,刘松玉.土力学[M].北京:中国建筑工业出版社,2010:167-169. Zhang Kegong,Liu Songyu.Soil mechanics[M].Beijing:China Architecture Building Press,2010:167-169.
  • Related Articles

    [1]SUN Zhifeng, QIU Ao, JIN Ya, LI Jie, LUO Bo, PENG Kaixuan. Optimal Design and Experimental Study of the Receiver Sonde in Multipole Acoustic LWD Tools[J]. Petroleum Drilling Techniques, 2022, 50(4): 114-120. DOI: 10.11911/syztjs.2022089
    [2]YAO Xiaojiang, LU Huatao, SHANG Jie, WANG Qinghua, LI Yang. Optimization Design and Numerical Analysis of Flow Passage Converters in LWD Tools[J]. Petroleum Drilling Techniques, 2021, 49(5): 121-126. DOI: 10.11911/syztjs.2021069
    [3]ZHU Weibing, ZHANG Chaojie, PANG Qingsong. Design and Optimization of the Crawling Mechanism of Rotary Sidewall Coring Device in Shale Gas Wells[J]. Petroleum Drilling Techniques, 2021, 49(3): 100-104. DOI: 10.11911/syztjs.2021043
    [4]FENG Jin, CHI Shaolin, ZHANG Manlai, CHEN Wei, HUANG Xinyu. Optimal Design of a Downhole Seismic Generator[J]. Petroleum Drilling Techniques, 2020, 48(5): 120-126. DOI: 10.11911/syztjs.2020117
    [5]CHEN Zuo, LI Shuangming, CHEN Zan, WANG Haitao. Hydraulic Fracture Initiation and Extending Tests in Deep Shale Gas Formations and Fracturing Design Optimization[J]. Petroleum Drilling Techniques, 2020, 48(3): 70-76. DOI: 10.11911/syztjs.2020060
    [6]ZHOU Bo, YANG Jin, ZHOU Jianliang, LIU Zhengli, YANG Jiangang. A Jetting Flow Rate Design Method for Conductor Installation through Jetting in Deepwater Drilling[J]. Petroleum Drilling Techniques, 2016, 44(3): 21-26. DOI: 10.11911/syztjs.201603004
    [7]Zhao Xin, Qiu Zhengsong, Gao Yonghui, Zhang Yongjun, Ma Yongle, Liu Xiaodong. Design Optimization for Water-Based Drilling Fluids in a Deepwater Gas Field on the Western Coast of Myanmar[J]. Petroleum Drilling Techniques, 2015, 43(4): 13-18. DOI: 10.11911/syztjs.201504003
    [8]Wang Lei, Zhang Hui, Zhou Yuyang, Ke Ke, Zhang Jinshuang, Peng Xing. Optimal Design of Hydraulic Parameters for Conductor Jetting in Deepwater Drilling[J]. Petroleum Drilling Techniques, 2015, 43(2): 19-24. DOI: 10.11911/syztjs.201502004
    [9]Jin Yequan, Wang Maolin. PDC Bit Drilling Parameter Optimization Design Integrating Cost and Drilling Rate[J]. Petroleum Drilling Techniques, 2012, 40(5): 13-16. DOI: 10.3969/j.issn.1001-0890.2012.05.003
    [10]Wen Zhiming, Li Ning, Zhang Bo. Optimal Trajectory Design of Ultra-Deep Horizontal Wells in Halahatang Block[J]. Petroleum Drilling Techniques, 2012, 40(3): 43-47. DOI: 10.3969/j.issn.1001-0890.2012.03.009

Catalog

    Article Metrics

    Article views (3792) PDF downloads (4438) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return