Subsea Completion Technology in the Liuhua 19-5 Gas Field

More Information
  • Received Date: July 13, 2015
  • Revised Date: June 13, 2016
  • To minimize costs and enhance the economic efficiency in the development of the marginal Liuhua 19-5 Gas Field, a new subsea production system is required. Accordingly, the subsea completion technique was investigated. Sand control and string designs were completed for offshore horizontal well completion, and technical measures for prevention of hydrates, scaling and waxing in wellbores were proposed. Moreover, optimal tools and materials for completion tools and string were selected, gas-lift drainage by nitrogen injection with coil tubing was deployed for production, and the emergency response program for drifting of submersible drilling platform was developed. Thus, the new subsea completion technology was formed. It was successfully adopted in two wells in the Liuhua 19-5 Gas Field, with average completion time of 30.32 days. Research and application results showed that the new subsea completion system could enhance production efficiency, reduce operational costs, and realize the effective development of marginal gas fields.
  • [1]
    朱江,周文胜.中国近海油气田区域开发战略思考[J].中国海上油气,2009,21(6):380-382,387. ZHU Jiang,ZHOU Wensheng.Pondering over the regional development strategy for oil and gas fields offshore China[J].China Offshore Oil and Gas,2009,21(6):380-382,387.
    [2]
    刘正礼,胡伟杰.南海深水钻完井技术挑战及对策[J].石油钻采工艺,2015,37(1):14-18. LIU Zhengli,HU Weijie.Countermeasures and challenges of deepwater drilling and completion technology in South China Sea[J].Oil Drilling Production Technology,2015,37(1):14-18.
    [3]
    程仲,张俊斌,刘正礼,等.深水压裂充填完井管柱设计及应用[J].石油钻探技术,2012,40(6):51-55. CHENG Zhong,ZHANG Junbin,LIU Zhengli,et al.Design and application of frac-pack completion string for deep-water wells[J].Petroleum Drilling Techniques,2012,40(6):51-55.
    [4]
    海上油气田完井手册编委会.海上油气田完井手册[M].北京:石油工业出版社,1998. Editorial Committee of Offshore Well Completion.Offshore well completion[M].Beijing:Petroleum Industry Press,1998.
    [5]
    王红林.海上气田精细防砂设计准则研究[D].成都:西南石油大学,2013:52-57. WANG Honglin.The research of fine sand control design standards for offshore gas fields[D].Chengdu:Southwest Petroleum University,2013:52-57.
    [6]
    何汉平,侯立中,王长林,等.伊朗Y油田基于流动保障的完井设计[J].石油钻探技术,2010,38(5):111-114. HE Hanping,HOU Lizhong,WANG Changlin,et al.Iranian Y Oilfield well completion design based on flow assurance[J].Petroleum Drilling Techniques,2010,38(5):111-114.
    [7]
    高斐,楼一珊,吴琼,等.新型井下动态腐蚀试验装置的研制与应用[J].石油钻探技术,2014,42(3):112-117. GAO Fei,LOU Yishan,WU Qiong,et al.Development and application of down hole dynamic corrossion test device[J].Petroleum Drilling Techniques,2014,42(3):112-117.
    [8]
    羊东明,李亚光,张江江,等.大涝坝气田油管腐蚀原因分析及治理对策[J].石油钻探技术,2011,39(5):82-85. YANG Dongming,LI Yaguang,ZHANG Jiangjiang,et al.Tubing corrosion analysis and control measures in Dalaoba Gas Field[J].Petroleum Drilling Techniques,2011,39(5):82-85.
    [9]
    邢希金,周建良,刘书杰,等.中国近海油套管防腐设计方法优化与防腐新策略[J].中国海上油气,2014,26(6):75-79. XING Xijin,ZHOU Jianliang,LIU Shujie,et al.Design method optimization and new strategy for tubing and casing anti-corrosion in China offshore[J].China Offshore Oil and Gas,2014,26(6):75-79.
    [10]
    钟声,黎洪,黄伟,等.水平井完井投产设计及其技术[J].油气井测试,2003,12(2):26-28. ZHONG Sheng,LI Hong,HUANG Wei,et al.The design of completion putting into production and its technology of horizontal wells[J].Well Testing,2003,12(2):26-28.
    [11]
    韦红术,王荣耀,张玉亭,等.南海深水钻井防台风应急技术[J].石油钻采工艺,2015,37(1):151-153. WEI Hongshu,WANG Rongyao,ZHANG Yuting,et al.Anti-typhoon emergency technology of deepwater drilling in South China Sea[J].Oil Drilling Production Technology,2015,37(1):151-153.
    [12]
    王俊荣,付英军,韦红术,等.考虑内波流影响的南海八号钻井平台锚泊能力分析评估[J].石油钻采工艺,2015,37(1):43-46. WANG Junrong,FU Yingjun,WEI Hongshu,et al.Analysis and assessment on anchoring capacity of NANHAI 8 drilling platform with effects of internal solitary wave current are considered[J].Oil Drilling Production Technology,2015,37(1):43-46.
    [13]
    龚铭煊,刘再生,段梦兰,等.深海水下采油树下放安装过程分析与研究[J].石油机械,2013,41(4):50-54. GONG Mingxuan,LIU Zaisheng,DUAN Menglan,et al.Research on the running installment process of deep sea underwater Christmas tree[J].China Petroleum Machinery,2013,41(4):50-54.
  • Related Articles

    [1]LI Shuanggui, LUO Jiang, YU Yang, TANG Ming, YI Hao, ZENG Dezhi. Establishing Pressure Profiles and Casing Program Optimization in the Southern Shunbei No. 5 Fault Zone[J]. Petroleum Drilling Techniques, 2023, 51(1): 9-15. DOI: 10.11911/syztjs.2022037
    [2]HOU Yawei, LIU Chao, XU Zhongbo, AN Yuhua, LI Jingling. A Method for Rapidly Predicting Recovery of Multi-Layer Oilfields Developed by Water-Flooding[J]. Petroleum Drilling Techniques, 2022, 50(5): 82-87. DOI: 10.11911/syztjs.2022102
    [3]WANG Jianyun, HAN Tao, ZHAO Kuanxin, ZHANG Lijun, XI Baobin, YE Xiang. Key Drilling Technologies for the Ultra-Deep Well Tashen 5[J]. Petroleum Drilling Techniques, 2022, 50(5): 27-33. DOI: 10.11911/syztjs.2022074
    [4]LIU Huamin, LI Mu, LIU Qiaoping, ZHANG Liyuan. Research and Application of Plunger Gas Lift Technology in the Fuling Shale Gas Field[J]. Petroleum Drilling Techniques, 2020, 48(3): 102-107. DOI: 10.11911/syztjs.2020022
    [5]CUI Hailin, ZHOU Yanjun, TANG Honglin, CAO Liming, SUN Ronghua, XIAO Xinlei. Integrated Wellbore Technologies to Enhance the Rate of Penetration for Well Dingye 5[J]. Petroleum Drilling Techniques, 2018, 46(1): 24-29. DOI: 10.11911/syztjs.2018029
    [6]LI Shan. Casing Optimization for CO2 Corrosion Resistance in the Xushen Gas Field[J]. Petroleum Drilling Techniques, 2016, 44(6): 55-59. DOI: 10.11911/syztjs.201606009
    [7]GAO Yingyun. Fracturing Technology for a V-Shaped Horizontal Well Cluster in the Yanchuannan CBM Field[J]. Petroleum Drilling Techniques, 2016, 44(3): 83-87. DOI: 10.11911/syztjs.201603015
    [8]Zhao Chongzhen. Network Fracturing Technology Applied to Xu 5 Tight Gas Reservoirs in the Xinchang Gas Field[J]. Petroleum Drilling Techniques, 2015, 43(6): 70-75. DOI: 10.11911/syztjs.201506013
    [9]Su Feng, Zhang Weiguo, Li Zemin, Chang Yuanjiang, Chen Guoming. Application of Underwater GPS Positioning Technique in Wellhead Positioning of Liuhua 4-1 Oilfield[J]. Petroleum Drilling Techniques, 2013, 41(3): 40-45. DOI: 10.3969/j.issn.1001-0890.2013.03.008
    [10]Wang Lihua, Lou Yishan, Deng Jingen, Ma Xiaoyong, Chen Yu. Optimization of Sand Control Methods and Parameters Selection for Shallow-Gas Fields in Deep-Water[J]. Petroleum Drilling Techniques, 2013, 41(1): 98-102. DOI: 10.3969/j.issn.1001-0890.2013.01.019

Catalog

    Article Metrics

    Article views (8589) PDF downloads (13847) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return