Sheng Leixiang, Wang Rongyao, Xu Liangbin, Jiang Shiquan, Zhou Jianliang. Safety Analysis of the Hang-off of Deepwater Drilling Risers during a Typhoon Emergency Period[J]. Petroleum Drilling Techniques, 2015, 43(4): 25-29. DOI: 10.11911/syztjs.201504005
Citation: Sheng Leixiang, Wang Rongyao, Xu Liangbin, Jiang Shiquan, Zhou Jianliang. Safety Analysis of the Hang-off of Deepwater Drilling Risers during a Typhoon Emergency Period[J]. Petroleum Drilling Techniques, 2015, 43(4): 25-29. DOI: 10.11911/syztjs.201504005

Safety Analysis of the Hang-off of Deepwater Drilling Risers during a Typhoon Emergency Period

More Information
  • Received Date: April 20, 2015
  • Revised Date: June 15, 2015
  • For semi-submersible platforms, proper response procedures for a typhoon include the recovery of all drilling risers and travel away from typhoon paths. But it takes a long time to recover risers resulting that sometimes there is no guarantee that the entire riser system can be recovered. Under such circumstances, suspensions of risers are inevitable. This study took the suspended risers as the research objects, considering dynamic tension, bending stress, flex joint angle of risers and the space interference with the moon pool. With the analysis method of finite element, the axial dynamic model of risers in suspension mode was established. with a super deep water well in the South China Sea (with water depth of 2460 m) being taken as an example, analysis models for soft and hard riser suspension models were set up,a deep water typhoon evacuation strategy was studied, the influence of different suspension models were reviewed, and drilling ship evacuation speed and sailing azimuths on riser safety were analyzed. Results showed that in the hard suspension model, when the sailing speed was 2 kn, safe evacuation azimuth was 0° to 45°, while for soft hang-off mode, at the same sailing speed 2 kn, the sailing azimuth was from 0° to 90°. Under the same ocean conditions, the sailing speed of the drilling ship allowed by soft hang-off model was higher than that by hard hang-off. Therefore, the adaptive capacity of the soft model to the wave load was greater than that of the hard model, so the soft model was recommended to use preferentially during evacuations from typhoons.
  • [1]
    Brekke,J N.Key Elements inultra-deep water drilling riser management[R].SPE/IADC 67812,2001.
    [2]
    畅元江.深水钻井隔水管设计方法及其应用研究[D].东营:中国石油大学(华东)机电工程学院,2008. Chang Yuanjiang.Design approach and its application for deepwater drlling risers[D].Dongying:China University of Petroleum Engineering(Huadong),College of Mechanical and Electronic Engineering,2008.
    [3]
    畅元江,陈国明,许亮斌,等.超深水钻井隔水管设计影响因素[J].石油勘探与开发,2009,36(4):523-528. Chang Yuanjiang,Chen Guoming,Xu Liangbin,et al.Influential factors for the design of ultra-deepwater drilling risers[J].Petroleum Exploration and Development,2009,36(4):523-528.
    [4]
    孙友义,陈国明,畅元江.下放或回收作业状态下超深水钻井隔水管轴向动力分析[J].中国海上油气,2009,21(2):116-119. Sun Youyi,Chen Guoming,Chang Yuanjiang.Axial direction dynamic analysis on ultradeep-water drilling riser under setting down and recovery operations[J].China Offshore Oil and Gas,2009,21(2):116-119.
    [5]
    鞠少栋,畅元江,陈国明,等.超深水钻井作业隔水管顶张力确定方法[J].海洋工程,2011,29(1):100-104. Ju Shaodong,Chang Yuanjiang,Chen Guoming,et al.Determination methods for the top tension of ultradeepwater drilling risers[J].The Ocean Engineering,2011,29(1):100-104.
    [6]
    鞠少栋,畅元江,陈国明,等.深水钻井隔水管连接作业窗口分析[J].石油勘探与开发,2012,39(1):105-110. Ju Shaodong,Chang Yuanjiang,Chen Guoming,et al.Envelopes for connected operation of the deepwater drilling riser[J].Petroleum Exploration and Development,2012,39(1):105-110.
    [7]
    鞠少栋,畅元江,陈国明,等.深水钻井隔水管悬挂窗口确定方法[J].石油学报,2012,33(1):133-136. Ju Shaodong,Chang Yuanjiang,Chen Guoming,et al.Determination of the hang-off window for deepwater drilling riser[J].Acta Petrolei Sinica,2012,33(1):133-136.
    [8]
    张磊,畅元江,刘秀全,等.深水钻井隔水管与防喷器紧急脱离后的反冲响应分析[J].石油钻探技术,2013,41(3):25-30. Zhang Lei,Chang Yuanjiang,Liu Xiuquan,et al.Recoil analysis for deepwater drilling riser after emergency disconnection with blowout preventer[J].Petroleum Drilling Techniques,2013,41(3):25-30.
  • Related Articles

    [1]DING Yuqi, LI Kangjian, FAN Qingquan, LU Ye, LYU Qilin, JIA Wei. Effect of Window Sidetrack Drilling on Thread Stress and Sealing Performance of Drill Strings[J]. Petroleum Drilling Techniques, 2024, 52(4): 75-86. DOI: 10.11911/syztjs.2024063
    [2]QIN Saibo, YI Xianzhong, CAI Xingxing, ZHANG Xuwen, WANG Lijun, ZHANG Xiliang. Development and Safety Research of Dead Line Anchors for JGZ97 10 000-Meter Ultra-Deep Well Drilling Rig[J]. Petroleum Drilling Techniques, 2024, 52(2): 236-242. DOI: 10.11911/syztjs.2024036
    [3]KUANG Shaohua, LYU Min, YANG Hong, WANG Lei, TONG Shanshan. Performance Evaluation of Sand Control Materialof Swelling Shape-Memory Particles[J]. Petroleum Drilling Techniques, 2022, 50(5): 88-93. DOI: 10.11911/syztjs.2022101
    [4]ZHANG Zhiliang, WANG Wei, YI Ming, LIU Qiang. Design and Implementation of a Downhole Safety Monitoring System[J]. Petroleum Drilling Techniques, 2020, 48(6): 65-70. DOI: 10.11911/syztjs.2020094
    [5]DUAN Youzhi, LIU Huanle, AI Shuang, QIN Xing, YUE Hui, LIU Boang. Test of the Expansion Performance for Shape Memory Screens[J]. Petroleum Drilling Techniques, 2020, 48(4): 83-88. DOI: 10.11911/syztjs.2020038
    [6]DONG Linfang, CHEN Xinyang. Performance Evaluation and Field Application of a Self-Suspending Proppant[J]. Petroleum Drilling Techniques, 2018, 46(6): 90-94. DOI: 10.11911/syztjs.2018144
    [7]XU Jianning, ZHENG Shunze, LI Zhongwen, XI Wenkui, WEI Yaming, YANG Xudong. Performance Analysis and Optimization of the Anchor Mechanism of Coupling Anchor Type Downhole Throttle[J]. Petroleum Drilling Techniques, 2018, 46(2): 103-108. DOI: 10.11911/syztjs.2018053
    [8]ZHENG Xiaozhi, ZHOU Baode, ZHANG Hongyan, DAI Wenchao, CHEN Zhifeng, LI Fenglei. Development and Performance Tests of Remotely-Controlled Cement Head[J]. Petroleum Drilling Techniques, 2017, 45(4): 81-86. DOI: 10.11911/syztjs.201704014
    [9]Long Gang, Li Meng, Guan Zhichuan, Liao Hualin. Evaluation Method of Casing Safety and Reliability in Deep Wells[J]. Petroleum Drilling Techniques, 2013, 41(4): 48-53. DOI: 10.3969/j.issn.1001-0890.2013.04.011
    [10]Wang Jinbo, Wang Zhiyuan, Zhang Weiguo, Xie Hua, Sun Baojiang. Well Control Safety Operation Cycle during Typhoon at Deep Waters of South China Sea[J]. Petroleum Drilling Techniques, 2013, 41(3): 51-55. DOI: 10.3969/j.issn.1001-0890.2013.03.010
  • Cited by

    Periodical cited type(1)

    1. 蒋振新,李军,郭勇,吴德胜,时培忠,杨宏伟,张更. 井下双梯度控压钻井井筒多相流动规律. 断块油气田. 2024(05): 936-944 .

    Other cited types(0)

Catalog

    Article Metrics

    Article views (3451) PDF downloads (3850) Cited by(1)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return