臧传贞,荆思霖,路宗羽,等. 小井眼水平井洗井岩屑清除效率研究[J]. 石油钻探技术,2024,52(3):1-9. DOI: 10.11911/syztjs.2024009
引用本文: 臧传贞,荆思霖,路宗羽,等. 小井眼水平井洗井岩屑清除效率研究[J]. 石油钻探技术,2024,52(3):1-9. DOI: 10.11911/syztjs.2024009
ZANG Chuanzhen, JING Silin, LU Zongyu, et al. Study on cuttings bed erosion efficiency for washing well in slim-hole horizontal wells [J]. Petroleum Drilling Techniques, 2024, 52(3):1-9. DOI: 10.11911/syztjs.2024009
Citation: ZANG Chuanzhen, JING Silin, LU Zongyu, et al. Study on cuttings bed erosion efficiency for washing well in slim-hole horizontal wells [J]. Petroleum Drilling Techniques, 2024, 52(3):1-9. DOI: 10.11911/syztjs.2024009

小井眼水平井洗井岩屑清除效率研究

Study on Cuttings Bed Erosion Efficiency for Washing Well in Slim-Hole Horizontal Wells

  • 摘要: 为研究小井眼水平井洗井钻柱旋转时的岩屑清除规律,针对玛湖深层三叠系长水平井小井眼洗井工况,进行了相似试验设计,开展了岩屑启动流速和岩屑清除效率的试验研究。通过试验发现,采用不同排量冲洗岩屑床,岩屑床呈现稳定运移、沙丘式波浪运移和整体运移3种运移形态。通过试验研究了岩屑床稳定运移形态下岩屑粒径、排量和钻柱转速对岩屑启动流速及钻柱转速对岩屑床高度和形成稳定岩屑床所需时间的影响规律;研究了岩屑床整体运移形态下岩屑粒径、排量和岩屑床初始质量对岩屑床清除效率的影响。结果表明,岩屑粒径越小所需启动流速越小,钻柱旋转后等效岩屑启动流速降低45.5%,钻柱转速升高会使形成稳定岩屑床所需时间缩短,提高岩屑清除效率;当岩屑床发生整体运移后,较低排量下岩屑床清除速度受岩屑粒径影响较小,高排量下大粒径岩屑床的运移速度快。排量和钻柱转速是提高洗井过程岩屑床清除效率的关键,而现在洗井时钻柱转速较低,可适当提高钻柱转速,以提高洗井效率。

     

    Abstract: In order to study cuttings erosion efficiency rule for well washing and drill pipe rotation in slim-hole horizontal wells, a similar experiment design was carried out to study cuttings start-up velocity and cuttings bed erosion efficiency according to the washing well condition of long horizontal wells in Mahu Triassic deep formation. It could be found that the cuttings bed in different flow rates show three distinct transport modes: stable cuttings bed movement, sand dune wave transport and cuttings bed overall transport. For the mode of stable cuttings bed movement, the effects of cuttings start-up velocity and drill pipe rotation on cuttings bed height and required stability time under different cuttings size, flow rate, and pipe rotation speed are analyzed. For the mode of the overall cuttings bed transport, the effects of cuttings size, flow rate, and initial length on the overall cuttings bed transport velocity are analyzed. Results indicated that the smaller the size of cuttings is, the smaller the required start-up velocity is. When the drill pipe rotates, the cuttings start-up velocity decreases by about 50%. The increased pipe rotation speed can reduce the required time for cuttings bed to become steady and improve the efficiency of the cuttings transport. For the mode of the overall cuttings bed transport, the effect of cuttings size on the erosion velocity is negligible at a lower flow rate, and the transport velocity of large cuttings size is fast at a high flow rate. Flow rate and pipe rotation are the keys to improving the efficiency of cuttings erosion. The drill pipe rotation speed in the existing well cleaning construction is low, which can be appropriately increased to improve the efficiency of well cleaning.

     

/

返回文章
返回