Managed Pressure Drilling Technique for Horizontal Wells in JZ251S Oilfield
-
摘要: JZ25-1S 油田水平井在钻进过程中,随着水平段长度增长会发生井漏问题,为此应用了控制压力钻井技术,控制井底循环压力低于地层漏失压力来解决该问题。首先根据地层漏失压力、井底循环压力和单位井段环空压力损失,计算井斜角90°时的安全钻进水平段长度,如果该水平段长度不符合开发要求,则再根据油气层厚度、油水界面、产层以上井段循环压力以及单位井段环空压力损失,计算安全钻进的最大井段长度和最大井斜角。JZ25-1S 油田JZ25-1S-A17 井水平段井斜角为90°时,安全钻进水平段长度只有965.00 m,通过计算得知,如果产层井段井斜角不大于86.67°便可以增加产层段长度,从而提高单井产量。实钻表明,该井控制产层井段井斜角不大于86.67°,使产层井段长度达到1 068.00 m,且未出现井漏。表明该方法能有效解决 JZ25-1S 油田水平井段钻进过程中,随水平段增长发生漏失的问题。
-
关键词:
- 控制压力钻井 /
- 水平井 /
- 环空压力 /
- 井斜角 /
- JZ25-1S 油田
Abstract: In order to deal with the loss of circulation caused by extension of horizontal section,Managed pressure drilling was applied to keep downhole circulating pressure under leak-off pressure during drilling.Allowable length of horizontal hole section with 90° inclination was calculated based on leak-off pressure,downhole circulating pressure and annular pressure loss in each meter of hole.If above length can’t meet the requirements of development,the longest horizontal length and inclination angle are calculated for safe drilling according to the thickness of pay zone,depth of oil-water contact ,circulating pressure above pay zone,and annular pressure loss for each meter of hole.It was predicted that horizontal well length for safety drilling was only 965 m for Well JZ25-1S-17 in JZ25-1S Oilfield.To enhance the well yield,it was estimated that length of hole could be extended in pay zone with less than 86.67° inclination.Actually with the well inclination controlled under 86.67°,the well length in pay zone reached to 1068 m without fluid loss.It showed that the method could effectively prevent the loss of circulation caused by extension of horizontal section while drilling.-
Keywords:
- managed pressure drilling /
- horizontal well /
- annulus pressure /
- deviation angle /
- JZ25-1S Oilfield
-
-
[1] 刘超,周玉海.吴红玲.等.控制压力钻井技术在衡6井的应用[J].石油钻采工艺,2009,31(9):34-37. Liu Chao,Zhou Yuhai,Wu Hongling,et al.Application of MPD technology to Heng 6 Well[J].Oil Drilling Production Technology,2009,31(3):34-37. [2] Nauduri S,Medley G H,Schubert J J.MPD:beyond narrow pressure windows[R].IADC/SPE 122276,2009.
[3] 向雪琳,朱丽华,单素华,等.国外控制压力钻井工艺技术[J].钻采工艺,2009,32(1):27-30. Xiang Xuelin,Zhu Lihua,Shan Suhua,et al.Foreign managed pressure drilling technology[J].Drilling Production Technology,2009,32(1):27-30. [4] 严新新,陈永明,燕修良.MPD技术及其在钻井中的应用[J].天然气勘探与开发,2007,30(2):62-66. Yan Xinxin,Chen Yongming,Yan Xiuliang.MPD and its application to drilling[J].Natural Gas Exploration Development,2007,30(2):62-66. [5] 周英操,崔猛,查永进.控压钻井技术探讨与展望[J].石油钻探技术,2008,36(4):1-4. Zhou Yingcao,Cui Meng,Zha Yongjin.Discussion and prospect of managed pressure drilling technology[J].Petroleum Drilling Techniques,2008,36(4):1-4. [6] 王果,樊洪海,刘刚,等.控制压力钻井技术应用研究[J].石油钻探技术,2009,37(1):34-38. Wang Guo,Fan Honghai,Liu Gang,et al.Application of managed pressure drilling technique[J].Petroleum Drilling Techniques,2009,37(1):34-38. [7] 杨雄文,周英操,方世良,等.国内窄窗口钻井技术应用对策分析与实践[J].石油矿场机械,2010,39(8):7-11. Yang Xiongwen,Zhou Yingcao,Fang Shiliang,et al.Strategy analysis of narrow window drilling technology and practice[J].Oil Field Equipment,2010,39(8):7-11. [8] Arnone M,Vieira P.Drilling wells with narrow operating windows applying the MPD constant bottom hole pressure technology-how much the temperature and pressure affects the operation’s design[R].IADC/SPE 119882,2009.
[9] 张桂林.土库曼斯坦亚苏尔哲别油田控压钻井技术[J].石油钻探技术,2010,38(6):37-41. Zhang Guilin.Application of managed pressure drilling technology in Azorse Area,Turkmenistan [J].Petroleum Drilling Techniques,2010,38(6):37-41. [10] 孙凯,梁海波,李黔,等.控压钻井泥浆帽设计方法研究[J].石油钻探技术,2011,39(1):36-39. Sun Kai,Liang Haibo,Li Qian,et al.Research mud on cap design of managed pressure drilling[J].Petroleum Drilling Techniques,2011,39(1):36-39. [11] 李宗清,燕修良,陈永明,等.三参数自动控压钻井系统的研制与试验[J].石油钻探技术,2012,40(6):99-103. Li Zongqing,Yan Xiuliang,Chen Yongming,et al.Development and test of three-parameter automatic pressure control drilling system[J].Petroleum Drilling Techniques,2012,40(6):99-103. [12] 杨雄文,周英操,方世良,等.控压钻井分级智能控制系统设计与室内试验[J].石油钻探技术,2011,39(4):13-18. Yang Xiongwen,Zhou Yingcao,Fang Shiliang,et al.Design and laboratory test of hierarchical intelligent control system for managed pressure drilling[J].Petroleum Drilling Techniques,2011,39(4):13-18.
计量
- 文章访问数: 3246
- HTML全文浏览量: 55
- PDF下载量: 3831