气体钻井钻柱疲劳失效周期分析

吴立新, 陈平, 祝效华, 张文华, 贾彦杰, 李金和

吴立新, 陈平, 祝效华, 张文华, 贾彦杰, 李金和. 气体钻井钻柱疲劳失效周期分析[J]. 石油钻探技术, 2012, 40(1): 42-46. DOI: 10.3969/j.issn.1001-0890.2012.01.009
引用本文: 吴立新, 陈平, 祝效华, 张文华, 贾彦杰, 李金和. 气体钻井钻柱疲劳失效周期分析[J]. 石油钻探技术, 2012, 40(1): 42-46. DOI: 10.3969/j.issn.1001-0890.2012.01.009
Wu Lixin, Chen Ping, Zhu Xiaohua, Zhang Wenhua, Jia Yanjie, Li Jinhe. Contrast of Fatigue Failure Cycles of Drill String during Gas Drilling[J]. Petroleum Drilling Techniques, 2012, 40(1): 42-46. DOI: 10.3969/j.issn.1001-0890.2012.01.009
Citation: Wu Lixin, Chen Ping, Zhu Xiaohua, Zhang Wenhua, Jia Yanjie, Li Jinhe. Contrast of Fatigue Failure Cycles of Drill String during Gas Drilling[J]. Petroleum Drilling Techniques, 2012, 40(1): 42-46. DOI: 10.3969/j.issn.1001-0890.2012.01.009

气体钻井钻柱疲劳失效周期分析

基金项目: 

国家科技重大专项"钻柱-PDC钻头-岩石系统动力学仿真技术研究"(编号:2008ZX05022-005-006HZ),国家自然科学"气体钻井钻具与井壁碰摩机理及量化评价方法研究"(编号:50804040)、"气体钻井技术基础研究"(编号:51134004)部分研究内容。

详细信息
    作者简介:

    吴立新(1966-),男,湖北武汉人,1988年毕业于石油大学(华东)石油地质专业,2000年获南开大学工商管理硕士学位,高级工程师,油气井工程专业在读博士研究生,主要从事油气钻探方面的管理与研究工作。

  • 中图分类号: TE921+.2

Contrast of Fatigue Failure Cycles of Drill String during Gas Drilling

  • 摘要: 钻柱的频繁失效严重制约着气体钻井的发展。为研究钻柱的疲劳失效周期,以深直井全井钻柱为研究对象,基于疲劳寿命预测的Forman模型,综合考虑深直井钻柱的动力学特性和气体钻井过程中局部热因素对钻柱疲劳寿命的影响,建立了气体钻井钻柱疲劳寿命计算方程。以川西某实钻井为例,利用建立的气体钻井钻柱疲劳寿命计算方程,对气体钻井条件下的钻柱疲劳寿命进行了计算,并与该层段钻井液钻井参数下的钻柱疲劳寿命进行了对比,初步获得了气体钻井与钻井液钻井的钻柱疲劳寿命关系模型。分析结果表明,气体钻井的钻柱疲劳寿命对初始裂纹非常敏感,初始裂纹越大钻柱寿命下降越明显;气体钻井各井段钻柱的疲劳寿命均明显低于钻井液钻井。
    Abstract: The development of gas drilling is restricted seriously because of frequent failure of drilling tools.To study the fatigue failure cycle of drill string,the whole drill string was taken in deep-vertical drilling as research subject.Based on Forman model in drill string fatigue life prediction,and taking consideration of the dynamic characteristics of drill string and the effect of local thermal factors on drill string fatigue life in gas drilling,the calculation equation of drill string fatigue life in gas drilling was established.Taking a real borehole in the west of Sichuan province as an example,the fatigue life of drill string in gas drilling was calculated with the established equation,then compared with that in mud drilling.Consequently,the relationship model of the fatigue life in gas and mud drilling was obtained.The results showed that the fatigue life of drilling tools was very sensitive to the initial crack.The initial crack develops larger,the fatigue life drops sharper.The fatigue life of drill string in each interval in gas drilling was obviously lower than that in mud drilling.
  • [1]

    Baryshnikov A,Calderoni A,Ligrone A,et al.A new approach to the analysis of drillstring fatigue behavior[J].SPE Drilling Completion,1997,12(2):77-84.

    [2] 邹海洋,狄勤丰,姚建林,等.气体钻井钻柱失效机理分析[J].石油钻探技术,2008,36(3):55-58. Zou Haiyang,Di Qinfeng,Yao Jianlin,et al.Drill-string failure mechanism in gas drilling[J].Petroleum Drilling Techniques,2008,36(3):55-58.
    [3] 李鹤林,冯耀荣.石油管材与装备失效分析案例集[M].北京:石油工业出版社,2006:63-75. Li Helin,Feng Yaorong.The cases collection of petroleum tubular goods and equipment failure analysis [M].Beijing:Petroleum Industry Press,2006:63-75.
    [4]

    Burgess T M,McDaniel G L,Das P K.Improving BHA tool reliability with drillstring vibration models:field experience and imitations.SPE/IADC 16109,1987.

    [5]

    Li Zifeng,Guo Boyun.Analysis of longitudinal vibration of drill string in air and gas drilling.SPE 107697,2007.

    [6]

    Howard J A,Halbert M E,Lubinski A.Systematic tracking of fatigue and crack growth to optimize drillstring reliability.SPE/IADC 25775,1993.

    [7]

    Bailey E I,Smith J E.The goodman diagram as an analytical tool to optimize fatigue life of rotary shouldered connections.SPE 79874,2003.

    [8]

    Hossain M M,Rahman M K,Rahman S S,et al.Fatigue life evaluation:a key to avoid drillpipe failure due to die-marks.IADC/SPE 47789,1998.

    [9]

    Hill T H,Ellis S E,Lee K,et al.An innovative design approach to reduce drillstring fatigue[J].SPE Drilling Completion,2005,20(2):94-100.

    [10]

    Wu Jiang.Drill-pipe bending and fatigue in rotary drilling of horizontal wells.SPE 37353,1996.

    [11] 李文飞,管志川,赵洪山,等.钻柱疲劳累积损伤的计算方法[J].中国石油大学学报:自然科学版,2008,32(3):60-62,67. Li Wenfei,Guan Zhichuan,Zhao Hongshan,et al.Calculation method of fatigue accumulative damage of drill string[J].Journal of China University of Petroleum:Edition of Natural Science,2008,32(3):60-62,67.
    [12] 林元华,邹波,付建红,等.考虑运动状态时全井段钻柱疲劳裂 纹扩展寿命计算研究[J].机械科学与技术,2005,24(4):404-407. Lin Yuanhua,Zou Bo,Fu Jianhong,et al.Research on how to predict the drillstring fatigue life of whole well with precession and backward precession[J].Mechanical Science and Technology,2005,24(4):404-407.
    [13] 徐灏.新编机械设计手册:下[M].北京:机械工业出版社,1995:206-213. Xu Hao.New machine design handbook:part Ⅱ[M].Beijing:China Machine Press,1995:206-213.
    [14]

    Dale B A.An experimental investigation of fatigue-crack growth in drillstring tubulars[J].SPE Drilling Engineering,1988,3(4):356-362.

    [15] 易当祥,刘春和,封艳文,等.扭力轴三维裂纹扩展寿命仿真研究[J].应用力学学报,2008,25(3):411-414. Yi Dangxiang,Liu Chunhe,Feng Yanwen,et al.Simulation to three-dimensional fatigue crack growth life of torsion bar in self-propelled gun[J].Chinese Journal of Applied Mechanics,2008,25(3):411-414.
    [16] 韩春杰,阎铁,毕雪亮,等.钻柱横向振动规律及应用[J].大庆石油学院学报,2004,28(1):14-16. Han Chunjie,Yan Tie,Bi Xueliang,et al.Rules and their application of drilling string lateral vibration [J].Journal of Daqing Petroleum Institute,2004,28(1):14-16.
    [17] 张小柯,狄勤丰.钻柱涡动时弯扭组合交变应力下的强度计算[J].天然气工业,2004,24(7):49-51. Zhang Xiaoke,Di Qinfeng.Strength calculation of the whirled drillstring at flexural-torsional alternate stress[J].Natural Gas Industry,2004,24(7):49-51.
    [18]

    Hehn L,Jellison M,Wyble K,et al.Catastrophic drill string failures caused by downhole friction heating:an increasing trend.SPE/IADC 105026,2007.

计量
  • 文章访问数:  2891
  • HTML全文浏览量:  99
  • PDF下载量:  3301
  • 被引次数: 0
出版历程
  • 收稿日期:  2011-07-17
  • 修回日期:  2011-12-07
  • 刊出日期:  1899-12-31

目录

    /

    返回文章
    返回