CO2 Flooding Well Productivity and Its Impacting Factor Sensitivity Analysis[J]. Petroleum Drilling Techniques, 2011, 39(1): 83-88. DOI: 10.3969/j.issn.1001-0890.2011.01.018
Citation: CO2 Flooding Well Productivity and Its Impacting Factor Sensitivity Analysis[J]. Petroleum Drilling Techniques, 2011, 39(1): 83-88. DOI: 10.3969/j.issn.1001-0890.2011.01.018

CO2 Flooding Well Productivity and Its Impacting Factor Sensitivity Analysis

  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return