李战奎,吴立伟,郭明宇,等. 渤中凹陷深层高压井地质工程一体化技术研究与应用[J]. 石油钻探技术,2024, 52(2):1-8. DOI: 10.11911/syztjs.2024031
引用本文: 李战奎,吴立伟,郭明宇,等. 渤中凹陷深层高压井地质工程一体化技术研究与应用[J]. 石油钻探技术,2024, 52(2):1-8. DOI: 10.11911/syztjs.2024031
Li Zhankui, Wu Liwei, Guo Mingyu, et al. Research and Application of Integrated Geological Engineering Technology for Deep High-Pressure Wells in the Bozhong Depression[J]. Petroleum Drilling Techniques,2024, 52(2):1-8. DOI: 10.11911/syztjs.2024031
Citation: Li Zhankui, Wu Liwei, Guo Mingyu, et al. Research and Application of Integrated Geological Engineering Technology for Deep High-Pressure Wells in the Bozhong Depression[J]. Petroleum Drilling Techniques,2024, 52(2):1-8. DOI: 10.11911/syztjs.2024031

渤中凹陷深层高压井地质工程一体化技术研究与应用

Research and Application of Integrated Geological Engineering Technology for Deep High-Pressure Wells in the Bozhong Depression

  • 摘要: 渤海湾盆地渤中凹陷深层潜山地质条件复杂,目的层埋藏深,钻遇地层层位多,岩性复杂多变,地层压力系统变化大,钻井过程中复杂情况频发,薄弱层易漏失,影响勘探开发进程。为此,研究了钻前井漏风险预测及地层压力校正,钻中高压段中完科学决策、潜山界面精确卡取和潜山地层压力随钻识别与控制等方面技术,实现了钻井设计及随钻调整方案调整优化,形成了渤中凹陷深层高压井全过程地质工程一体化技术。渤海油田20口深层高压探井应用全过程地质工程一体化技术后,钻井复杂情况降低60%,井漏、溢流等复杂情况处理时间下降40%,潜山界面识别准确率100%,单井节约成本3 000万元以上。全过程地质工程一体化技术为渤海油田深层超深层勘探开发提供了技术途径,具有较好的应用前景。

     

    Abstract: The geological conditions of the deep buried hills in the Bozhong Depression of the Bohai Bay Basin are complex, with deep burial of the target layer, multiple geological layers encountered during drilling, complex and variable lithology, and significant changes in the formation pressure system. During the drilling process, complex situations occur frequently, and weak layers are prone to leakage, which affects the exploration and development process. By predicting the risk of wellbore leakage before drilling and correcting formation pressure, making precise decisions in the high-pressure section during drilling, accurately capturing the buried hill interface, and identifying and controlling the formation pressure while drilling, technological breakthroughs have been achieved. The drilling design and adjustment plan during drilling have been adjusted and optimized, and the integrated geological engineering technology for the entire process of deep high-pressure wells in the Bozhong Depression has been established. After the application of integrated geological engineering technology throughout the entire process in 20 deep high-pressure exploration wells in Bohai Oilfield, the drilling complexity has been reduced by 60%, the processing time for complex situations such as well leakage and overflow has been reduced by 40%, the accuracy of identifying buried hill interfaces has been 100%, and the cost of a single well has been saved by more than 30 million yuan. The integrated technology of whole process geological engineering provides a technical approach for deep and ultra deep exploration and development of Bohai Oilfield, and has good application prospects.

     

/

返回文章
返回