Key Parameters of Removing Blockage with Rotating Jets and Sand-Tubes
-
摘要: 部分油气井因井漏失返而无法建立全井循环,传统解堵工艺难以解决此类油气井的堵塞,为此开展了旋转射流联合沉砂筒解堵工艺研究.旋转射流联合沉砂筒解堵工艺是利用油管将高压水输送至旋转喷头形成旋转射流,破碎井底堵塞物,堵塞物被上返液运送至一定高度,在环空液柱升高漏失量增大或停泵等因素影响下,堵塞物沉积在旋转喷头上方的沉砂筒内,随着沉砂筒起出带至地面.利用固液两相流体力学对堵塞物进行了受力分析,推导出不同类型的堵塞物上返所需流速的计算公式,并根据力矩平衡原理推导出了旋转喷头正向喷嘴水力参数计算公式.卧51井采用旋转射流联合沉沙筒解堵工艺进行冲砂解堵,15 min冲砂进尺达9.98 m,解堵效果良好,表明该工艺可以较好地解决低压油气井堵塞的问题,为油气井解堵提供了新思路.Abstract: Whole-well circulation could not be built up for some oil and gas wells due to low pressure,and easy circulation loss and traditional blockage removing could not be used to clean these wells.In this paper,a novel technique was implemeneted,which involved a new plug removal technology,in which high pressure water through an oil tube rotates the nozzle,and rotating jets were formed to break up the blocking-mass.The broken blocking-mass would move up in water drive.When the leakage increased or pumping stopped,the blocking-mass would deposit in the sand-tube above the rotating nozzle and be brought to the ground with the sand-tube.A forced analysis of the blocking-mass was studied by solid-fluid mechanics,and the return flow rates with different silt styles were presented.The equation for calculating hydraulic parameter of rotating nozzle was derived by the moment balance theory.This plug removal technology was applied in Well Wo-51,and the blocking-mass of 9.98 meters was cleared in 15 min.It showed that the removing blockage with rotating jet and sand-tube turned out to be an effective blockage removing method for wells with low pressure and easy circulation loss.It would provide a novel means to plug removal.
-
Keywords:
- rotating jet /
- sand-tube /
- local-circulation /
- plug removal /
- sand washing /
- Well Wo-51
-
-
[1] 张荣军,蒲春生.振动-土酸酸化复合解堵室内实验研究[J].石油勘探与开发,2004,31(5):114-116,132. Zhang Rongjun,Pu Chunsheng.Vibration-mud acidization treatment broken down experiment[J].Petroleum Exploration and Development,2004,31(5):114-116,132. [2] 梁春,李庆,焦亚凤.水力振动法处理油层技术的研究与应用[J].大庆石油地质与开发,2006,25(2):65-67. Liang Chun,Li Qing,Jiao Yafeng.Research and application of hydraulic vibration for oil layer treatment[J].Petroleum Geology Oilfield Development in Daqing,2006,25(2):65-67. [3] 朱继东,张建国,石爱霞,等.声波解堵综合配套技术研究[J].石油钻探技术,2006,34(1):59-61. Zhu Jidong,Zhang Jianguo,Shi Aixia,et al.Comprehensive supporting technology for plug removal with sonic wave[J].Petroleum Drilling Techniques,2006,34(1):59-61. [4] 李伟翰,颜红侠,王世英,等.近井地带解堵技术研究进展[J].油田化学,2005,22(4):381-384. Li Weihan,Yan Hongxia,Wang Shiying,et al.Developments in applications and researches of blockage removal technologies in near borehole zones for stimulating oil production[J].Oilfield Chemistry,2005,22(4):381-384. [5] 王羽曦.超短半径水平井钻井技术在注入井解堵中的应用[J].石油钻探技术,2013,41(5):89-92. Wang Yuxi.Application of ultra-short radius horizontal well drilling technology in plugging removal in injectors[J].Petroleum Drilling Techniques,2013,41(5):89-92. [6] 黄中伟,李根生,刘全国,等.振荡-酸化深部复合解堵机理与应用[J].石油勘探与开发,2006,33(5):618-621. Huang Zhongwei,Li Gensheng,Liu Quanguo,et al.Mechanisms and applications of removing blockage with oscillating jet and acid[J].Petroleum Exploration and Development,2006,33(5):618-621. [7] 孙永壮,杜丙国,邵宣涛.机械捞砂工艺研究[J].石油学报,2006,27(6):125-127,132. Sun Yongzhuang,Du Bingguo,Shao Xuantao.Research on mechanical sand-bailing technology[J].Acta Petrolei Sinica,2006,27(6):125-127,132. [8] 李根生,马加计,沈晓明,等.高压水射流处理地层的机理及试验[J].石油学报,1998,19(1):96-99. Li Gensheng,Ma Jiaji,Shen Xiaoming,et al.A study on mechanisms and effects of plug removal near wellbore with high pressure water jet[J].Acta Petrolei Sinica,1998,19(1):96-99. [9] 董长银,栾万里,周生田,等.牛顿流体中的固体颗粒运动模型分析及应用[J].中国石油大学学报:自然科学版,2007,31(5):55-59,63. Dong Changyin,Luan Wanli,Zhou Shengtian,et al.Analysis and application of model for solid particle movement in Newton fluid[J].Journal of China University of Petroleum:Edition of Natural Science,2007,31(5):55-59,63. [10] 陈建兵,王超,刘贵远,等.磨料射流切割套管技术研究及在海上弃井中的应用[J].石油钻探技术,2013,41(5):46-51. Chen Jianbing,Wang Chao,Liu Guiyuan,et al.Casing cutting technology through abrasive water jet and its applications in offshore abandoned wells[J].Petroleum Drilling Techniques,2013,41(5):46-51. [11] Douglas J F,Gasiorek J M,Swaffield J A.Fluid mechanics[M].London:Mining Publishing House,1979:235-240.
计量
- 文章访问数: 2709
- HTML全文浏览量: 71
- PDF下载量: 3704