Wu Junxia, Huang Jianlin, Yue Hui, He Hanping, Fu Daoming. The Technology for Releasing Packers by means of Formation Pressure in Well S22[J]. Petroleum Drilling Techniques, 2014, 42(6): 59-63. DOI: 10.11911/syztjs.201406012
Citation: Wu Junxia, Huang Jianlin, Yue Hui, He Hanping, Fu Daoming. The Technology for Releasing Packers by means of Formation Pressure in Well S22[J]. Petroleum Drilling Techniques, 2014, 42(6): 59-63. DOI: 10.11911/syztjs.201406012

The Technology for Releasing Packers by means of Formation Pressure in Well S22

More Information
  • Received Date: January 09, 2014
  • Revised Date: October 23, 2014
  • AHR packer retrieval by normal overpull can be difficult when they have been set in highly deviated or horizontal sections,or when improper operations have caused workover problem.The axial force of tubing in horizontal well was analyzed based on structure and mechanism analysis of the AHR packer,and the over pull force that transmitted to the packer was simulated.Within the rated tensile strength of tubing if the overpull was not sufficient to overcome the preset releasing force of the packer,coil tubing could be utilized to evacuate the tubing by pumping nitrogen through positive circulation,and release formation pressure to push the packer upwards,at the same time, tubing could be pulled for shearing off the pins and releasing the packer.Taking Well S22 in Y field as an example,when the pulling force reached a tensile strength of 921 kN,the force transmitted to the packer was only 236 kN,then 1 650 m was tubing was evacuated and 205 kN upwards force was released,the total force applied to the pins of the packer was 441 kN,the packer was successfully released.The study demonstrated that the evacuation of partial fluid to release the formation pressure can compensate for the insufficient releasing force on the packer,and the approach can provide reference of theory and practice for releasing packers in highly deviated or horizontal wells.
  • [1]
    何汉平,吴俊霞,黄健林,等.伊朗雅达油田完井工艺[J].石油钻采工艺,2012,34(4):27-30. He Hanping,Wu Junxia,Huang Jianlin,et al.Well completion technique in Yada Field in Iran[J].Oil Drilling Production Technology,2012,34(4):27-30.
    [2]
    古小红,母建民,石俊生,等.普光高含硫气井环空带压风险诊断与治理[J].断块油气田,2013,20(5):663-666. Gu Xiaohong,Mu Jianmin,Shi Junsheng,et al.Diagnosing and managing on risk of annular casing pressure in high-sulfur gas well of Puguang Gas Field[J].Fault-Block Oil Gas Field,2013,20(5):663-666.
    [3]
    张承武,贾海,乔雨,等.WELLCAT软件的三超气井完井设计优化[J].钻采工艺,2013,36(6):63-66. Zhang Chengwu,Jia Hai,Qiao Yu,et al.Completion design optimization of ultra-temperature ultra-pressure ultra-deep gas well based on WELLCAT software[J].Drilling Production Technology,2013,36(6):63-66.
    [4]
    吕芳蕾,伊伟锴,衣晓光,等.高温高压封隔器性能试验装置研制与应用[J].石油矿场机械,2014,43(7):77-80. Lv Fanglei,Yi Weikai,Yi Xiaoguang,et al.Development and application of high temperature and high pressure packer performance test device[J].Oii Field Equipment,2014,43(7):77-80.
    [5]
    赵晓伟,王百,朱洪征,等.水平段封隔器解封力的分析[J].石油矿场机械,2013,42(7):35-38. Zhao Xiaowei,Wang Bai,Zhu Hongzheng,et al.Analysis of the packer reopened force in the horizontal segment[J].Oil Field Equipment,2013,42(7):35-38.
    [6]
    艾池,于法浩,冯福平,等.带封隔器的油套合压管柱油管临界排量计算[J].石油钻探技术,2014,42(1):81-85. Ai Chi,Yu Fahao,Feng Fuping,et al.Calculation of tubing critical pump rate while fricturing by both tubing and casing with packers[J].Petroleum Drilling Techniques,2014,42(1):81-85.
    [7]
    王志坚,邓卫东,林忠超,等.水平井封隔器卡瓦的有限元分析及结构改进[J].石油钻采工艺,2013,35(4):78-81. Wang Zhijian,Deng Weidong,Lin Zhongchao,et al.Finite element analysis and structure improvements of packer slip in horizontal wells[J].Oil Drilling Production Technology,2013,35(4):78-81.
    [8]
    周晓君,段志明,赵磊,等.封隔器锁紧机构关键几何参数分析[J].石油机械,2014,42(4):90-93. Zhou Xiaojun,Duan Zhiming,Zhao Lei,et al.Analysis of the key geometric parameters for the locking mechanism of packer[J].China Petroleum Machinery,2014,42(4):90-93.
    [9]
    庞振力.准确确定卡瓦式封隔器坐封位置的计算方法[J].油气井测试,2013,22(5):70-71. Pang Zhenli.Calculation method to accurately determine the location of slip-type packer[J].Well Testing,2013,22(5): 70-71.
    [10]
    王金忠,肖国华,郑贞,等.大斜度井逐级解卡锚定器研制与应用[J].石油矿场机械,2013,42(10):63-66. Wang Jinzhong,Xiao Guohua,Zheng Zhen,et al.Development and application of step by step unfreezing anchor in highly deviated well[J].Oil Field Equipment,2013,42(10):63-66.
    [11]
    左凯,马认琦,陈永锋,等.封隔器套铣打捞工具反循环打捞碎屑性能分析[J].石油机械,2013,41(10):75-78. Zuo Kai,Ma Renqi,Chen Yongfeng,et al.Performance analysis of reverse circulation debris fishing with packer milling and fishing tool[J].China Petroleum Machinery,2013,41(10):75-78.
  • Cited by

    Periodical cited type(6)

    1. 刘伟,唐纯静,付加胜,宋先知,徐宝昌,计杨杨. 复杂油气溢漏早期识别与安全控制研究进展. 石油机械. 2023(05): 9-16 .
    2. 李根生,宋先知,祝兆鹏,田守嶒,盛茂. 智能钻完井技术研究进展与前景展望. 石油钻探技术. 2023(04): 35-47 . 本站查看
    3. 李华洋,邓金根,谭强,冯永存,董保宏,曹志鹏,严科. 智能钻井技术应用体系构建及研究进展. 现代化工. 2023(10): 41-45+51 .
    4. 赵春兰,殷慧敏,王兵,范翔宇,吴昊. 基于结构方程与蒙特卡洛方法的钻井现场作业风险评价. 天然气工业. 2019(02): 84-93 .
    5. 张硕. 井筒风险录井评价技术研究与应用. 录井工程. 2019(02): 28-33+133 .
    6. 曾义金. 海相碳酸盐岩超深油气井安全高效钻井关键技术. 石油钻探技术. 2019(03): 25-33 . 本站查看

    Other cited types(9)

Catalog

    Article Metrics

    Article views (3031) PDF downloads (3706) Cited by(15)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return