Xu Honglin, Zhang Zhi, Shi Taihe, Xiong Jiyou. Stress Analysis of the Cement Sheath under both Pressure and Temperature[J]. Petroleum Drilling Techniques, 2014, 42(6): 45-48. DOI: 10.11911/syztjs.201406009
Citation: Xu Honglin, Zhang Zhi, Shi Taihe, Xiong Jiyou. Stress Analysis of the Cement Sheath under both Pressure and Temperature[J]. Petroleum Drilling Techniques, 2014, 42(6): 45-48. DOI: 10.11911/syztjs.201406009

Stress Analysis of the Cement Sheath under both Pressure and Temperature

More Information
  • Received Date: February 12, 2014
  • Revised Date: October 11, 2014
  • Significant changes of the wellbore pressure and temperature in HPHT wells may bring great challenges to the mechanical integrity of the cement sheath.On the basis of the multi-layer thick wall cylinder theory of elastic mechanics,this paper proposed a mechanical theoretical model of cement sheath under both pressure and temperature,and investigated the distribution of radial and tangential stresses within cement sheath.Results of studies demonstrate that when the sustained casing pressure(SCP)is 10-50MPa and wellbore temperature change(WTC)is -50-50℃,the cement sheath is generally radially compressed and tangentially tensioned,and the maximum compressed and tangential stresses are both at the inner wall of the cement sheath.When the WTC keeps constant,both stresses increase with the increase of the pressure inside the casing.When the SCP is constant,both stresses increase with the increase of the WTC and decrease with the decrease of the WTC.A wellbore temperature increase will aggravate the possibility of tangential tensile failure in cement sheath,and a wellbore temperature decrease will lead to its failure due to radial tension.Consequently,wellbore temperature changes should be considered for their effect on the stress of the cement sheath,and the cement with lower elastic modulus and higher bond stength with casing and formation should be used to enhance the comprehensive mechanical performance of cement sheath in HPHT wells.
  • [1]
    Nevio M,Augusto Z,Enrico B,et al.Intelligent and interventionlesszonal isolation for well integrity in Italy[R].SPE 119869,2009.
    [2]
    NORSOK Standard D-010 Well integrity in drilling and well operations[S].
    [3]
    张智,周延军,付建红,等.含硫气井的井筒完整性设计方法[J].天然气工业,2010,30(3):67-69. Zhang Zhi,Zhou Yanjun,Fu Jianhong,et al.A method of well integrity design for sour gas wells[J].Natural Gas Industry,2010,30(3):67-69.
    [4]
    Dan T M,Virgilio G,Robert L D,et al.Characterizing casing-cement-formation interactions under stress conditions:impact on long-term zonal isolation[R].SPE 90450,2004.
    [5]
    Laidler A,Taoutaou S,Johnson C R,et al.A risk analysis approach using stress analysis models to design for cement sheath integrity in a multilateral well[R].SPE 11059,2007.
    [6]
    王耀锋,李军强,杨小辉.套管-水泥环-地层系统应力分布规律研究[J].石油钻探技术,2008,36(5):7-10. Wang Yaofeng,Li Junqiang,Yang Xiaohui.Stress distribution in casing-cement-stratum[J].Petroleum Drilling Techniques,2008,36(5):7-10.
    [7]
    李静,林承焰,杨少春,等.套管-水泥环-地层耦合系统热应力理论解[J].中国石油大学学报:自然科学版,2009,33(2):63-69. Li Jing,Lin Chengyan,Yang Shaochun,et al.Theoretical solution of thermal stress for casing-cement-formation coupling system[J].Journal of China University of Petroleum:Edition of Natural Science,2009,33(2):63-69.
    [8]
    Li Yong,Liu Shuoqiong,Wang Zhaohui,et al.Analysis of cement sheath coupling effects of temperature and pressure in non-uniform in-situ stress field[R].SPE 131878,2010.
    [9]
    Nabipour A,Joodi B,Sarmadivaleh M.Finite element simulation of downhole stresses in deep gas wells cements[R].SPE 132156,2010.
    [10]
    高孝巧,杨浩,熊繁升,等.油质岩原位加热井下温度场及热应力研究[J].断块油气田,2014,21(3):373-377. Gao Xiaoqiao,Yang Hao,Xiong Fansheng,et al.Temperature field and thermal stress of downhole system for in-situ heating on oil shale[J].Fault-Block Oil Gas Field,2014,21(3):373-377.
  • Cited by

    Periodical cited type(16)

    1. 王思维,何淼,许明标,戴白妹. 高温高压气井测试井筒温度应力场耦合分析. 断块油气田. 2024(01): 168-176 .
    2. 丁士东,刘奎,刘小刚,周仕明,陶谦,李鹏程. 环空加压固井对双层套管水泥环界面径向应力的影响. 石油钻探技术. 2022(01): 30-37 . 本站查看
    3. 高德利,刘奎,王宴滨,刘金海,李轩. 页岩气井井筒完整性失效力学机理与设计控制技术若干研究进展. 石油学报. 2022(12): 1798-1812 .
    4. 李成嵩,李社坤,范明涛,陈旭波,靳迪,高飞,王茜. 水平井压裂过程中固井界面裂缝的扩展规律. 钻井液与完井液. 2022(06): 761-766+775 .
    5. 杜伟峰,杨焕强,黄志强,黄鹏. 围压条件下水泥封固长度对封隔能力的影响规律. 石油机械. 2021(07): 53-58 .
    6. 黄鹏,李杨,李东,范华冰,刘冬. 高温高压固井第一界面径向胶结强度试验研究. 石油机械. 2021(11): 39-44 .
    7. 王鹏,腰世哲. 文96储气库注采井井筒完整性研究. 石油化工腐蚀与防护. 2020(06): 11-14 .
    8. 高德利,刘奎. 页岩气井井筒完整性若干研究进展. 石油与天然气地质. 2019(03): 602-615 .
    9. 唐庚,张华礼,李军,周浪,候培培,黄浩然. 水泥环完整性研究进展. 内蒙古石油化工. 2019(03): 1-5 .
    10. 曾静,高德利,王宴滨,房军. 体积压裂井筒水泥环拉伸失效机理研究. 钻采工艺. 2019(03): 1-4+6 .
    11. 张万栋,李炎军,吴江,杨玉豪,杨焕强. 高温条件下的固井第一界面水力胶结强度实验研究. 钻采工艺. 2019(05): 24-26+7 .
    12. 王涛,申峰,展转盈,马振锋,刘云,侯云翌. 高强微弹水泥浆在延长油田致密油水平井中的应用. 石油钻探技术. 2019(05): 40-48 . 本站查看
    13. 杨博文. 页岩气田套管环空带压原因及保护对策. 江汉石油科技. 2018(01): 26-31 .
    14. 席岩,柳贡慧,李军,查春青,王超,刘明杰. 页岩气井体积压裂井筒温度计算及套管强度变化分析. 断块油气田. 2017(04): 561-564 .
    15. 刘奎,高德利,曾静,房军,王宴滨. 温度与压力作用下页岩气井环空带压力学分析. 石油钻探技术. 2017(03): 8-14 . 本站查看
    16. 马绰,康志勤. 新型矿井套管-水泥环变形与渗漏试验研究. 煤炭技术. 2016(06): 48-50 .

    Other cited types(18)

Catalog

    Article Metrics

    Article views (2699) PDF downloads (3544) Cited by(34)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return