Abstract:
With respect to technical challenges such as complex geological conditions, long drilling duration, and high proportions of non-production time in ultra-deep wells in the Kuqa Piedmont, and in combination with the engineering characteristics of difficult-to-drill formations including ultra-thick gravel layers, composite salt-gypsum layers, and tight sandstone reservoirs, technical research was carried out following the geology-engineering integration approach. The research covered bit optimization for different intervals, bottom hole assembly (BHA) optimization, casing program and cementing program optimization, upgrading of high-temperature-resistant drilling fluid systems, integration of logging procedures, and pre-judgment of downhole failures. As a result, six key technologies for rate of penetration (ROP) improvement were developed, including non-planar-cutter polycrystalline diamond compact (PDC) bits, a BHA of “vertical drilling tool + high-torque positive displacement motor (PDM) + shock absorber”, “slimmed-down” casing program, a packaged cementing operation workflow, and rapid drilling fluid conversion. Field application results showed that the drilling duration in major blocks such as Bozi, Dabei, Kela, and Keshen were shortened by 15%–45% overall. The single-bit footage of non-planar-cutter PDC bits increased by more than 1.5 times. The average time of drilling fluid system conversion per well was shortened by 11.5 days. The proportion of intermediate completion operation time related to cementing was reduced to less than 30%. The study indicates that ROP improvement for ultra-deep wells in the Kuqa Piedmont should adhere to the technical route of “bits as the core, BHA as the support, design optimization as the source, and management innovation as the guarantee”, and establish a differentiated ROP improvement technology system for different intervals, which can effectively overcome the technical bottleneck of low drilling efficiency in ultra-deep wells.