库车山前超深井钻井提速关键技术

Key Technologies for ROP Improvement of Ultra-Deep Wells in Kuqa Piedmont

  • 摘要: 针对库车山前超深井地质条件复杂、钻井周期长、非生产时效占比高等技术难点,结合巨厚砾石层、复合盐膏层、致密砂岩储层等难钻地层的地质特征,根据地质工程一体化技术思路,进行了分层段钻头优选、钻具组合优化、井身结构与固井方案优化、抗高温钻井液体系升级、测井工序整合及井下故障预判等技术研究,形成非平面齿 PDC 钻头、“垂直钻井工具+大扭矩螺杆+减振器”钻 具组合、井身结构“瘦身”优化、套餐式固井作业流程、钻井液快速转换等6大钻井提速关键技术。现场应用表明:博孜、大北、克拉、克深等主力区块钻井周期整体缩短15%~45%;非平面齿PDC钻头单只进尺提升150%以上;单井钻井液转换周期平均缩短11.5 d;固井相关中完作业时间占比降至30%以内。研究结果表明,库车山前超深井钻井提速应坚持“钻头为核心、钻具集成为支撑、设计优化为源头、管理创新为保障”的技术路线,构建分层段差异化提速技术体系,可有效破解超深井钻井效率偏低的技术瓶颈。

     

    Abstract: With respect to technical challenges such as complex geological conditions, long drilling duration, and high proportions of non-production time in ultra-deep wells in the Kuqa Piedmont, and in combination with the engineering characteristics of difficult-to-drill formations including ultra-thick gravel layers, composite salt-gypsum layers, and tight sandstone reservoirs, technical research was carried out following the geology-engineering integration approach. The research covered bit optimization for different intervals, bottom hole assembly (BHA) optimization, casing program and cementing program optimization, upgrading of high-temperature-resistant drilling fluid systems, integration of logging procedures, and pre-judgment of downhole failures. As a result, six key technologies for rate of penetration (ROP) improvement were developed, including non-planar-cutter polycrystalline diamond compact (PDC) bits, a BHA of “vertical drilling tool + high-torque positive displacement motor (PDM) + shock absorber”, “slimmed-down” casing program, a packaged cementing operation workflow, and rapid drilling fluid conversion. Field application results showed that the drilling duration in major blocks such as Bozi, Dabei, Kela, and Keshen were shortened by 15%–45% overall. The single-bit footage of non-planar-cutter PDC bits increased by more than 1.5 times. The average time of drilling fluid system conversion per well was shortened by 11.5 days. The proportion of intermediate completion operation time related to cementing was reduced to less than 30%. The study indicates that ROP improvement for ultra-deep wells in the Kuqa Piedmont should adhere to the technical route of “bits as the core, BHA as the support, design optimization as the source, and management innovation as the guarantee”, and establish a differentiated ROP improvement technology system for different intervals, which can effectively overcome the technical bottleneck of low drilling efficiency in ultra-deep wells.

     

/

返回文章
返回